The following storage capacities are published for information only.
BASIC STORAGE SERVICE (bundled capacities)
| Storage group |
Technical capacity |
Reserved capacity * |
Available capacity
(technical capacity - reserved capacity) |
volume
TWh |
withdrawal
GWh/j |
injection
GWh/j |
volume
TWh |
withdrawal
GWh/j |
injection
GWh/j |
volume
TWh |
withdrawal
GWh/j |
injection
GWh/j |
| Centre |
50,20 |
612,2 |
456,4 |
50,20 |
612,2 |
456,4 |
0,00 |
0,0 |
0,0 |
| Ile de France Nord |
14,20 |
136,5 |
123,5 |
14,20 |
136,5 |
123,5 |
0,00 |
0,0 |
0,0 |
| Ile de France Sud |
13,50 |
321,4 |
217,7 |
13,50 |
321,4 |
217,7 |
0,00 |
0,0 |
0,0 |
| Lorraine |
7,30 |
94,8 |
91,3 |
7,30 |
94,8 |
91,3 |
0,00 |
0,0 |
0,0 |
| Salins Sud |
8,50 |
447,4 |
81,0 |
8,50 |
447,4 |
81,0 |
0,00 |
0,0 |
0,0 |
| Picardie |
12,70 |
270,2 |
92,7 |
12,69 |
270,1 |
92,6 |
0,007** |
0,1 |
<0,1 |
Data expressed at 0°C.
(*) : including returnable capacity.
(**) : returnable capacity of 7 GWh.
Important : a supplier which would like to acquire storage capacity and which has for the Allocation on 1st November, acquired new rights since "the Allocation on 1st April", will be provided additional storage capacity for supplying its corresponding customers, to those that it taken out by way of its rights on 1st April, in accordance with the regulation in force.
Details for reserved bundled capacity
| Storage Group |
DGI range of rights for end customers |
excess storage capacity
|
| 1st November Allocation |
returnable capacity |
volume GWh |
volume GWh |
volume GWh |
| Centre |
48 850 |
0 |
1 350 |
| Ile de France Nord |
13 900 |
0 |
300 |
| Ile de France Sud |
11 592 |
160 |
1748 |
| Lorraine |
7 300 |
0 |
0 |
| Salins Sud |
7 647 |
61 |
792 |
| Picardie |
12 616 |
77 |
0 |
Data expressed at 0°C.
Update : 11/15/2007
ADDITIONAL VOLUME (unbundled capacity)
| Storage Group
|
Technical Capacity |
Reserved capacity |
Available capacity*
|
Volume
TWh |
Volume
TWh |
Volume
TWh |
| Centre |
0,20 |
0,20 |
0,00 |
(*) : Available capacity = technical capacity - reserved capacity.
CONDITIONAL WITHDRAWAL CAPACITY (unbundled capacity)
| Storage Group
|
Technical Capacity |
Reserved capacity |
Available capacity*
|
Maximal withdrawal
GWh/j |
withdrawal
GWh/j |
withdrawal
GWh/j |
| Centre |
183,7 |
180,4 |
3,3 |
| Ile de France Nord |
41,0 |
39,9 |
1,1 |
| Ile de France Sud |
64,3 |
56,5 |
7,8 |
| Lorraine |
23,7 |
22,4 |
1,3 |
| Salins Sud |
268,4 |
251,8 |
16,6 |
| Picardie |
40,5 |
40,3 |
0,2 |
Data expressed at 0°C.
(*) : Available capacity = technical capacity - reserved capacity.
Update : 11/15/2007
CONDITIONAL INJECTION CAPACITY (unbundled capacity)
| Storage Group |
Technical capacity |
Reserved capacity |
Available capacity*
|
Maximal Injection
GWh/j
|
Injection
GWh/j
|
Injection
GWh/j
|
| Centre |
114,1 |
92,3 |
21,8 |
| Ile de France Nord |
18,5 |
16,4 |
2,1 |
| Ile de France Sud |
32,7 |
28,7 |
4,0 |
| Lorraine |
13,7 |
12,4 |
1,3 |
| Salins Sud |
24,3 |
21,5 |
2,8 |
| Picardie |
27,8 |
27,7 |
0,1 |
Data expressed at 0°C.
(*) : Available capacity = technical capacity - reserved capacity.
Update : 11/15/2007
The only capacities not accessible to third parties are the capacities
reserved for infrastructures operators (see article 2(9) of the European
Directive 2003/55/EC of 26 june 2003) |