The following storage capacities are published for information only.
BASIC STORAGE SERVICE (bundled capacities)
| Storage
group |
Technical
capacity |
Reserved
capacity * |
Available
capacity
(technical capacity - reserved capacity) |
volume
TWh |
withdrawal
GWh/j |
injection
GWh/j |
volume
TWh |
withdrawal
GWh/j |
injection
GWh/j |
volume
TWh |
withdrawal
GWh/j |
injection
GWh/j |
| Centre |
51,0 |
622,0 |
463,6 |
51,0 |
622,0 |
463,6 |
0 |
0 |
0 |
| Ile de France Nord |
14,6 |
140,4 |
127,0 |
14,6 |
140,4 |
127,0 |
0 |
0 |
0 |
| Ile de France Sud |
13,5 |
321,4 |
217,7 |
13,5 |
321,4 |
217,7 |
0 |
0 |
0 |
| Lorraine |
7,3 |
94,8 |
91,3 |
7,3 |
94,8 |
91,3 |
0 |
0 |
0 |
| Salins Sud |
9,5 |
527,8 |
90,5 |
9,5 |
527,8 |
90,5 |
0 |
0 |
0 |
| Picardie |
12,8 |
272,3 |
93,4 |
12,8 |
272,3 |
93,4 |
0 |
0 |
0 |
(*) : including returnable capacity.
Data expressed at 0°C.
Update : 12/01/2008
Important : a supplier which would like to
acquire storage capacity and which has for the Allocation on 1st
November, acquired new rights since "the
Allocation on 1st April", will be provided additional storage
capacity for supplying its corresponding customers, to those that
it taken out by way of its rights on 1st April, in accordance with
the regulation in force.
Details for reserved bundled capacity
| Storage
Group |
DGI
range of rights for end customers |
excess
storage capacity |
| 1st Novembre
Allocation |
returnable
capacity |
volume
GWh |
volume
GWh |
volume
GWh |
| Centre |
49 501
|
0,06
|
1 500
|
| Ile de France Nord |
12 400
|
0
|
2 200
|
| Ile de France Sud |
11 500
|
0,05
|
2 000
|
| Lorraine |
7 298
|
2,4
|
0
|
| Salins Sud |
8 810
|
340
|
350
|
| Picardie |
12 800
|
0
|
0
|
Data expressed at 0°C.
Update : 12/01/2008
ADDITIONAL VOLUME (unbundled capacity)
| Storage Group |
Technical Capacity |
Reserved capacity |
Available capacity*
|
Volume
TWh |
Volume
TWh |
Volume
TWh |
| Centre |
0,20 |
0,20 |
0,00 |
(*) : Available capacity = technical capacity - reserved capacity.
Data expressed at 0°C.
Update : 04/10/2008
CONDITIONAL WITHDRAWAL CAPACITY (unbundled capacity)
| Storage
Group |
Technical Capacity |
Reserved capacity |
Available capacity*
|
Maximal withdrawal
GWh/j |
withdrawal
GWh/j |
withdrawal
GWh/j |
| Centre |
186,6 |
177,5 |
9,1 |
| Ile de France Nord |
42,1 |
35,8 |
6,3 |
| Ile de France Sud |
72,9 |
62,8 |
10,1 |
| Lorraine |
23,7 |
21,7 |
2,0 |
| Salins Sud |
290,3 |
266,3 |
24,0 |
| Picardie |
40,9 |
40,2 |
0,7 |
(*) : Available capacity = technical capacity - reserved capacity.
Data expressed at 0°C.
Update : 12/01/2008
CONDITIONAL INJECTION CAPACITY (unbundled capacity)
| Storage
Group |
Technical capacity |
Reserved capacity |
Available capacity*
|
Maximal Injection
GWh/j
|
Injection
GWh/j
|
Injection
GWh/j |
| Centre |
115,9 |
89,0 |
26,9 |
| Ile de France Nord |
19,0 |
14,0 |
5,0 |
| Ile de France Sud |
32,7 |
27,7 |
5,0 |
| Lorraine |
13,7 |
12,8 |
0,9 |
| Salins Sud |
27,1 |
21,8 |
5,3 |
| Picardie |
32,7 |
32,0 |
0,7 |
(*) : Available capacity = technical capacity - reserved capacity.
Data expressed at 0°C.
Update : 12/01/2008
The only capacities not accessible to third parties are the capacities
reserved for infrastructures operators (see article 2(9) of the European
Directive 2003/55/EC of 26 june 2003) |